Welcome to the company's official website!
  • 1
  • 2

Slitting line operation process

Time::2016-08-23From:www.fengqimachinery.comtype:Industry news

1. Preparations
(1) Ready for a variety of production tools, Check if there is a bolt from the guide plate out.
(2) To confirm each button in the console around zero and equipment without obstructions.
(3) Closed cabinet switch, start each DC power supply and pumping stations, turn the gas source.
2. Adjustment scissors
Unloading knife: to remove the arch, opening operation side rack, then hook spanner to loosen the nut of the shaft up and down to remove, put on protective wire sets. Remove the pressure ring knife, then remove the blade, and finally wipe clean arbor with a clean cloth.
Install knife: in the process of isolation set and install knife, must to be cleaned with a clean cloth before you install the knife, first install the cutting edge.
3. Threading strip:
Uncoiling worker: the coil hanging onto the saddle - the upper strip uncoiler to the center line - supporting the support before the event, the car fell, rose diameter reel, roll pressure - artificial strip will wear to the force guide rollers at - be on the cutting edge can be cut so that the leading edge - strip through the rear discs cut, accumulator placed under the guide plate, carried red jacket.
Control worker: Jog uncoiler Story, disc shear, the strip reaches the tension station - Jog the strip through hydraulic shear, pressure roll - will work with the take-up reel and the wear strip Trail up - and down the leader board after accumulator guides back accumulator punch sets.
Coiling work: When the master station to the strip pinch roller pressing the pinch roller clamp strip - in master workers with the strip coiler head into the jaw and up Trail - after the guide plate placed under the swing support after the event - the system will automatically hit - the tension nip roller pressing station - will strip coiler roll 3-5 laps, pay station tension, depressed assertive Taiwan pinch rollers lifted.
Waste collection: the waste side of the wire through to the scrap collecting machine, and then start the machine to collect scrap waste collection.

Return